Submit livening certificate

Installation Details

Typical examples for Service Mains Routes:

  • Underground: Underground cable running from pillar to connection point (e.g., house or pump).
  • Overhead to Underground: Fuse at a pole and service cable running down the pole and underground to the connection point.
  • Overhead: Aerial conductor running overhead from pole to connection point.
  • Underground to Overhead: Starting point is a pillar (the fuse is located in the pillar). Cable running underground to service pole and then running aerially from the service pole to connection point.
Customer Details
Livening Details

The above ICP connection has been livened and complies with all current Unison and NZ regulatory requirements relating to livening this installation including mains and switchboard, but not the whole installation.

Earth Loop Impedance Test Results
Test Result *