Before you apply

Let’s get it right first time

There are things you should consider and information to gather before you begin your application, to help the process run smoothly. We’ve laid out below the key technical and commercial information we think you might need to know. Please explore this content before beginning your application. 


Speak with a solar agent or installer, electrician or electrical consultant

They should be able to advise on technical requirements and the feasibility of your system for a connection to Unison.

It’s also worth talking to your energy retailer about the metering you will need from them if you are to export, and the buy-back rates they can offer to pay you for any electricity you export.


Check out our capacity maps

Before you invest in any equipment or commit to a project, have a look at the network capacity in your location. This may shape how much electricity you can export regardless of the capacity of your system, and may impact the feasibility of your project and connection. 


Explore the technical and commercial information below

Check out the technical information below, including export limits, tests and inspections, and technical compliance standards; as well as commercial information like conditions, contract terms, pricing, and more. 


Apply before you install your system

It pays to apply to Unison before you install your system on your property. If we need to make any network adjustments in order to connect you, it can be much harder to do that once the system is already installed.

Technical

Information on the technical aspects of connecting

Generation approvals for our network need to comply with some technical standards.  These are there to ensure that your generation system works for both you and for our other network customers, as well as protecting our staff and assets.  The standards cover things like safety, the quality and voltage of the power that is exported, and automatic shut down or disconnection of your system in the event of any defects at your or our end of the connection.

You can find more detail on our technical standards and a list of approved inverters.  We’d encourage you to talk to your installer about the ability of your system to meet these standards before applying.

We may require testing, inspection or certification that your system can meet all the standards as a condition or any interim approval of you application.  We will detail the testing, studies or certification needed when we notify you of any initial or interim approval decision.

An export limit is the maximum amount of electricity your system can send into our network at any moment. It isn't a cap on how much your system generates, or on how much you use yourself.  It only limits what goes out to our lines.

We set the limit for your site, based on our connection standards and what the network in your area can take. Your installer configures your equipment to stay within that limit, usually through a setting on the inverter or a separate export control device. If no export control is fitted, we assess your system on its full capacity instead.  So, limiting exports is often the simpler option.


It's measured across your whole site

If you have more than one inverter on your site, or you're adding to an existing system, we assess the combined total exporting into our network, not each inverter separately. So, it’s helpful to consider that when for instance you want to add solar panels or a battery to an existing installation.


A limit is a ceiling, not a guarantee

Your limit is the most you may export. It isn't a promise that you'll always be able to export that much. In parts of our network where capacity is tight, exports may be reduced at times (see Congestion management for how and why that happens).


Keeping to your limit

We may verify your generation system's export capability, including by inspecting the installation, and your test or compliance documentation needs to show it's configured correctly. If you later want to change your export limit, you’ll need to submit a new application for that purpose, as you need our approval before changing your connection or your inverter's protection settings.

Most of the key information you will need to apply for a generation or export approval can be provided by your installer. Ask them about the following;

What to gather

Purpose

The inverter make and model, and a Declaration of Conformity certificate if the inverter is not on our list of approved inverters.​

This helps us determine if your application can follow the fast-track process for earlier approval, or the standard process.​

The maximum export power in kW, and whether an export limit will be set​

Please note this figure is NOT the 'panel rating' of your system. It's the most electricity your system can send into our network, which may be less than your panels produce, particularly if an export limit is set. So it can decide whether the fast-track or standard process applies​

Confirmation the installation will meet AS/NZS 4777.2:2020 and AS/NZS 4777.1:2024 ​

This helps us determine if your application can follow the fast-track process for earlier approval, or the standard process.​

Expected connection date​

This helps us to plan our pipeline of connections​

If you already have solar or a battery, have the details to hand. We will assess the total export capacity at your property, not just any new parts.​

After approval you'll also need the Certificate of Compliance from your electrician, within 10 working days — and don't switch on and export before we have it.​

For some fast-track applications we may need to inspect your system to satisfy ourselves that it will comply with our technical and operating standards.  We will give you a minimum of 2 business days notice of any inspection needed.  If we find any areas of non compliance you will have 10 business days to remedy them before your application can proceed.  In extreme cases we may need you to disconnect your system until the defects have been remedied.

Standard applicants will need to arrange their own test and inspection to show that their system meets our standards. It is important to give us reasonable advance notice of when the testing is happening. We may send our own personnel along to observe. You will need to send us a written test report afterwards with evidence that your system complies. If we're already satisfied your system complies, we may tell you that testing isn't needed.

In accordance with Electricity Code 6 we will invoice you for any reasonable  costs we incur for inspections, observations or for the process of remedying deficiencies.   Our standard charges for this can be found in the pricing pages on this website content.

Commercial

Information on the commercial aspects of connecting

When we approve your application we may attach conditions. These are things your system needs to meet or do before you connect. For most small systems these are straightforward, and your installer will be familiar with them.

You'll need to accept any conditions before you connect. If you don't agree with one, tell us and we'll work through it with you.

Why congestion happens

Our network has a finite amount of room for electricity flowing in either direction. As more generation connects, and as demand grows and changes shape, some parts of our network will reach their limits. Where that happens, we manage it with our congestion management approach.


What it means for you

Your approved export limit is the maximum you may send into our network. It isn't a guarantee that you'll be able to export that much at all times. In constrained parts of the network we may reduce or temporarily stop your export, and constraints can grow over time as more generation connects nearby. There is no payment for electricity you're unable to export.


We'll tell you where we can

We'll make reasonable efforts to let you know before we interrupt your connection and to work with you to limit the impact. Some situations, such as faults, emergencies, or safety risks,  don't allow for us to give full warning. Where an unplanned outage occurs we'll do what we reasonably can to restore your connection and tell you how long we expect it to take.

Congestion isn't the only reason your export may be affected. Planned maintenance and construction, faults and storm damage, and safety issues can all interrupt your connection temporarily.

If we approve your application, a standard set of connection terms applies automatically — there's nothing to sign. These terms covers aspects like safety, access, protection settings, who can switch what off, and when, power quality and liability.  The generation terms are not a pricing contract for paying you for the electricity you export from your system (commonly referred to as a ‘buy back rate’).  You will need to enter into your own separate contract with an electricity retailer to receive any financial compensation for electricity you export.

Standard contract terms will apply automatically for all approved applications.  These terms are mandatory for all approvals of fast-track applications with an inverter on Unison’s approved list.  Other applicants will have (insert 10 business days small projects, 30 business days medium + large projects) from the date of our final approval to notify Unison.  You must reply within this timeframe either way. Whether you are accepting the standard terms (and all the conditions of our approval) or asking to negotiate a non-standard contract. If we do not hear from you, your approval will lapse and you will need to apply again. 

Together we will have 30 business days to conduct good faith negotiations to reach agreed contract terms. The standard terms under schedule 6.2 of the Electricity Participation Code will apply if we can’t agree alternative terms.  The above notice and negotiation timeframes can in need be extended by mutual agreement between us.

The following fees apply from 1 November 2024 for processing distributed generation applications for approval to install

Export Limit

Fee Type

Fee (excl GST)

Small Generation:

10 kw or less

Application fee:  for administration and approval of installation

$140

Additional Processing fee: for obtaining information missing from an application or needing further clarification or evaluation.

$110

Inspection fee: for an inspection of SSDG, if one is required by Unison

$90

Need more information?

Capacity queries:

if you want to know more about capacity near your site

Contact Us

if you want to talk to us about a potential connection

Phone: 0800 2 UNISON | 0800 2 86476 | e-mail: [email protected]